Our experts are ready to tell you in detail about the solutions and services of the T1 Integration

T1 Integration offers a full range of services for the construction, reconstruction, technical re-equipment and modernization of energy facilities at the enterprises of the fuel and energy complex, industry, oil and gas industry and housing and communal services in Russia and CIS countries.

The company's priority activity in the energy sector is the implementation of projects for the construction, modernization and reconstruction of generating capacities: thermal power plants, power centers and boiler houses with a capacity of up to 200 MW, transformer and distribution substations with a voltage of up to 330 kV. T1 Integration offers comprehensive solutions in the field of energy construction and implements turnkey projects of any complexity. Having broad competencies in this area, the company performs a full cycle of work, including:

  • Development of design and estimate documentation

  • Design and survey work

  • Coordination of project documentation in the bodies of Rostechnadzor and Rosexpertiza

  • Production and supply of technological equipment, building materials and structures

  • Construction works

  • Installation and commissioning

  • Warranty and service

  • Operation of facilities

We cooperate with domestic and foreign manufacturers: General Electric, Siemens, Caterpillar, Centrax, Cummins, FG Wilson, LOOS INTERNATIONAL, Rolls-Royce, Viessmann, Elektrozavod, etc. T1 Integration has all the necessary licenses and certificates of admission to survey, design and construction work. The company's management system meets the requirements of both international standards and domestic GOST: GOST R ISO 9001-2008 (ISO 9001:2008), GOST R ISO 14001-2007 (ISO 14001:2004).

T1 Integration offers a wide range of IT services and solutions aimed at the development and implementation of a single information technology space of electric power enterprises. Our portfolio of solutions includes both universal and specialized solutions: accounting systems, dispatching, process control, etc. The integrated solution is based on the concept of smart grids of the new generation Smart Grid.

The main task of IT solutions is to increase the efficiency of the technological chain of the enterprise, as well as to obtain reliable and operational technical and economic information at all stages of key technological processes. It is also important to ensure safety in the conduct of the technological process, the organization of commercial accounting, improving the environmental situation, etc.

T1 Integration solves such tasks of electric power companies as: improving the efficiency of all levels of management, supporting the current activities and long-term development of the enterprise, minimizing losses and reducing unit costs, increasing capitalization, modernizing systems of relationships with counterparties and customer service.

T1 Integration also provides the necessary IT infrastructure to solve current and future tasks.

More
Solutions and services
Projects
Mass Media about us
Reviews
  • Строительство энергетических объектов
    • Тепловые электростанции, включая парогазовые комбинированного цикла, газотурбинные, дизельные, газопоршневые

    • Гидроэлектростанции

    • Объекты на основе ВИЭ

    • Объекты электросетевого комплекса (РП, РТП, ПС)

    • Объекты жилищно-коммунального хозяйства (котельные, тепловые пункты)

  • Модернизация и реконструкция тепловых и гидроэлектростанций, в том числе с повышением единичной мощности энергоблоков
  • Комплексное постгарантийное обслуживание энергообъектов, поставка оборудования, сервис
  • Строительство промышленных и инфраструктурных объектов
  • Строительство линий электропередач (воздушные, кабельные)
  • Комплексный технологический аудит
  • EPC-/EPCM-проекты под ключ
    • Организация проведения экспертиз проектов, подготовка ТЭО или обоснований инвестиций строительства, которые включают технические решения, варианты комплектации основным оборудованием, первоначальную оценку стоимости строительства и окупаемости проекта

    • Исполнение функций шефнадзора по различным видам работ

    • Полный комплекс проектных работ с учетом геологических, природных и климатических особенностей местности

    • Строительные работы

    • Поставка оборудования и материалов

    • Монтажные работы

    • Пусконаладочные работы

    • Ввод в эксплуатацию и передача объекта заказчику

  • Reconstruction of the boiler house "Lermontov 200" for developing districts of Yakutsk

    T1 Integration performs a complex of works on engineering-geological surveys and development of design estimates documentation, as well as work on supporting documentation during the examination.

    During the reconstruction of the boiler room, an expansion will be made the existing building with the installation of five new thermal boilers with a capacity of 13 MW each, five modern burners, four of which are dual-fuel, and the installation of an energy-efficient auxiliary equipment. The project will increase boiler capacity from the current 19 MW to 65 MW - almost 3.5 times.

  • Modernization of Mogilev CHPP-1 commissioned by RUE Mogilevenergo (Republic of Belarus)

    The current electric capacity of Mogilev CHPP-1 is 21.2 MW, installed thermal capacity of turbine selections - 149 Gcal/hour. To increase the reliability of heat generation and power supply, as well as efficiency of use The reconstruction of fuel and energy resources provides for installation of a gas turbine with an electric capacity of 30 MW with automated emission control system on the smoke the pipe of a heat recovery boiler producing 40 tons of steam per hour. The total efficiency of the gas turbine plant will be 36.5%. Fuel for GTU is natural gas.

    The technological scheme of the CCGT is a power unit, consisting of a gas turbine unit manufactured by General Electric, two booster gas compressors and heat recovery boiler, pump-shut-off valves, hydraulic lock chemical water treatment plants. The PSU is designed to work in heating mode and is integrated into the existing the technological scheme of the boiler room with steam output to the general the highway.

  • Modernization of Mogilev CHPP-3 commissioned by RUE Mogilevenergo (Republic of Belarus)

    For the first time, the boiler house of the city of Mogilev will be equipped with modern combined-cycle gas plant for generating electricity and heat energy with a high efficiency , followed by transfer to the Belarusian energy system. Before reconstruction the boiler house produced 160 GCal/h of heat without generating electricity. After the reconstruction, the facility will generate 10% more heat and an additional 18 MW of electricity per year. hour. The overall efficiency of the CCGT will be 82%.

    The technological scheme of the CCGT is a power unit, consisting of two gas turbine units manufactured by Siemens, two booster gas compressors and two heat recovery boilers with steam turbine. The PSU is designed to work in heating mode and is integrated into the existing the technological scheme of the boiler room. Within the framework of the contract "T1 Integration" will perform a full range of works on the project, including design, purchase of equipment, testing of equipment at the factory, installation, commissioning, start-up tests and training of the customer's personnel. The full range of work on the project is planned to be completed in 18 months.

  • Construction of a boiler house for the State Unitary Enterprise "Housing and Communal Services Republic of Sakha (Yakutia)"

    T1 Integration performs design and construction of 2 boiler houses with a capacity of 12.5 MW with laying more than 2.5 km of new heating networks with the use of pre-insulated pipelines. The main fuel for the boiler room equipped with five hot water boilers is coal of the Zyryansky coal mine. Provided fully automatic boiler room operation and fuel supply to boilers.

  • Provision of backup power supply to facilities of FSUE "RTRS"

    T1 Integration carried out the delivery in a short time and fulfilled complex of works on installation and commissioning of diesel generators installations (DGS) to provide backup power supply republican, regional and regional radio transmission centers RTRS on the territory of 82 regions of Russia - from Sakhalin to Kaliningrad. The capacity of the DSU ranges from 10 kW to 2.5 MW.

    The complex of works performed by T1 Integration included delivery to RTRS facilities of fully equipped FG Wilson diesel generator sets with a capacity from 15 to 250 kVA, depending on the facility, installed in all-weather conditions containers, with automatic load switching panels. T1 Integration also developed and agreed on the project documentation in the relevant supervisory authorities.

  • Supply of a power unit for the Syrdarya thermal power plant (Republic of Uzbekistan)

    T1 Integration performs a comprehensive project for the supply of, installation, commissioning and commissioning of 3 turbo expanders DGA-5000 installations at the Syrdarya thermal power plant. Total capacity the power unit is 18 MW. The new equipment will allow significantly reduce the cost of electricity generated. Within the framework of the project "T1 Integration" organizes training of TPP personnel skills in the operation of turbo-expander installations.

  • Supply of a power unit for Talimardzhanskaya TPP (Republic of Uzbekistan)

    For Talimarjan TPP "T1 Integration" performs a project on implementation of the DGA-5000 turbodetander unit with a capacity of 6 MW with the purpose of increasing the energy efficiency of the enterprise and reducing the cost of electricity generation. The project is being implemented "under key": delivery, installation, commissioning, commissioning.

  • Design of the power unit for JSC "RosOEZ"

    T1 Integration has carried out the design of an energy center on the territory of the special economic zone of tourist and recreational type (SEZ) "Turquoise Katun" in the Altai Territory. Energy Center designed to generate electricity from natural gas and thermal energy to fully meet the needs the economic zone with a total area of 3326 hectares. "T1 Integration" approved the project documentation in the relevant organizations and provided technical support for the project during the passage state expertise.

    In accordance with the technical specification, the power center is designed taking into account the phased commissioning of capacities. Maximum calculated The thermal capacity of the facility is over 39 Gcal/hour (45 MW), and the electrical capacity is 25 MW. The power unit consists of 4 gas piston generator sets with a two-stage system heat recovery, 5 gas turbine generator sets, 5 heat recovery boilers, peak hot water boiler house, 4 gas booster compressors, high-voltage switchgear RU-10.5 kV, backup and emergency diesel generator sets.

  • Construction of a power unit for LLC "Hospital VIT"

    T1 Integration designed, built and prepared for operation an energy center for the Ural Clinical medical and rehabilitation center in Nizhny Tagil. Power unit it is built on the basis of 4 gas piston generator sets (GPGS) FG Wilson PG-750B with a two-stage heat recovery system, it also includes an absorption refrigeration unit, switchgear RU-0.4 kV and emergency diesel generator set. Total electrical power the system is 3 MW, and the thermal capacity is 4.5 MW.

    The power unit operates in the trigeneration mode, as much as possible energy-efficient consumption of natural gas for generation electricity, heat and cold, and provides parallel work with IDGC power grids.

    The power center is located in a detached building with an area of 750 sq. m, equipped with all necessary engineering systems. Thanks to comprehensive automation, including the implementation of automated remote control system, and the system dispatching the power center does not require constant presence service personnel.

  • GPES for FSUE "Enterprise for the supply of Business Management products President of the Russian Federation"
  • GPP for Rosneft
  • DES for Zagorskaya PSPP
STATE UNITARY ENTERPRISE "HOUSING AND COMMUNAL SERVICES ECONOMY OF THE REPUBLIC OF SAKHA (YAKUTIA)" Maximov I. P. Director of the branch of DSO GUP Housing and Communal Services RS (Ya)

Within the framework of the project "Construction of Boiler houses "Novaya-1" and "Novaya-2" with heating networks in the village of Chersky of Nizhnekolymsky district RS (I)" Technoserv company has completed a full range of works and deliveries ("turnkey"). Suggested by the company's specialists "Technoserv" design works are carried out in accordance with the current norms.

TEPLOENERGIYA JOINT STOCK COMPANY Potapov N. S. Head of UKS JSC Teploenergiya

Within the framework of the project "Reconstruction of the boiler house "Lermontov 200" in the city of Yakutsk" Technoserv AS company has completed a complex work on the development of a POI with subsequent examination industrial safety and registration with Rostechnadzor, as well as a complex of construction and installation works on the zero cycle device.

RUE MOGILEVENERGO Shishov A.M. Chief Engineer

Within the framework of the project "Reconstruction of the district boiler house "RK-3" in Mogilev,"Technoserv company has completed a full range of design, construction, installation, commissioning. All works they were carried out qualitatively, without violating the established deadlines, in accordance with the project documentation and the requirements of the industrial safety and regulatory documents.

RUE MOGILEVENERGO Shishov A.M. Chief Engineer

Within the framework of the project "Reconstruction of turbines of station No. 3 and station No. 4 of Mogilev thermal power plant No. 1", the company Technoserv has delivered a complete list of equipment, complete a complex of design, construction, installation, commissioning works. The equipment for the facility was put into operation on time and it is working successfully to the present time.

STATE UNITARY ENTERPRISE "HOUSING AND COMMUNAL SERVICES ECONOMY OF THE REPUBLIC OF SAKHA (YAKUTIA)" Sutemyev Yu . I. First Deputy General Director for production – Chief Engineer of SUE "Housing and Communal Services RS (Ya)"

Within the framework of the project "Construction of Boiler Houses "Novaya-1" and "Novaya-2" with heating networks in the village of Chersky of Nizhnekolymsky district RS (I)" Technoserv company has completed a full range of works and deliveries ("turnkey").

GOVERNMENT OF THE REPUBLIC OF SAKHA (YAKUTIA) Kolodeznikov A. Z. First Deputy Prime Minister Republic of Sakha (Yakutia)

On behalf of the Government of the Republic of Sakha (Yakutia), I express to you gratitude for well-coordinated and conscientious work in construction life-supporting facilities in the village of Chersky of Nizhnekolymsky ulus.

RUE "BELINVESTENERGOSBEREZHENIE" Knysh V. V. Director of RUE "Belinvestenergosberezhenie"

"RUE "Belinvestenergosberezhenie" (Republic of Belarus) expresses gratitude for the work done at the Mogilev CHPP-3 facility. Technoserv staff showed high qualification and professionalism when performing design, construction, installation, commissioning works and supplies of equipment. Despite the fact that the power equipment is supplied from various foreign manufacturers, Technoserv promptly resolved issues on their engineering and technological adaptation at the facility and successful delivery of everything the energy complex is put into commercial operation."

"NORTHGAS" Zimin B. A. General Director of CJSC "Northgas"

"For the power supply of the eastern dome of the North Urengoy The Technoserv company has developed a gas condensate field the working draft of the power complex with an electric capacity of 6 MW and thermal capacity of 15 MW on the basis of gas piston generators Waukesha installations equipped with a heat recovery system and peak hot water boiler house. The design work was completed within the time limits set by the contract and with proper quality."

"ENROSA" Afanasyev A. I. Executive Director of CJSC Enrosa

"Technoserv Company performed contract work on two objects JSC "St. Petersburg Electric Networks" (reconstruction of 35 kV substation No. 610 and the design of the 110 kV Neudorf substation). All works and deliveries they were carried out on time and with proper quality. Technoserv Company is a reliable partner in the creation and implementation of system projects engineering support of facilities".

"RITEK" Ioanesyan G. K. Chief Power Engineer

"For the power supply of the Galyanovskoye licensed field the site of NGDU "rITEKKHants-Mansiyskneft" Technoserv company delivered four diesel generator sets of container Elcos versions, with a unit power of 108 kW, for power supply PPD of the Bush No. 7 of the Serginsky field of the NPU "Ritekbeloyarskneft" - two diesel generator sets of container design Elcos, with a single capacity of 400 kW. Supply of equipment and The commissioning works were carried out by Technoserv specialists within the time limits set by the contract and with proper quality."

GOLITSYNSKY EXPERIMENTAL MECHANICAL PLANT Tilo P. A. General Director of OMZ "Golitsynsky"

"JSC OMZ "Golitsynsky" cooperates with "Technoserv" in terms of implementation works and supplies of power plant equipment for own needs based on Waukesha gas piston generator sets (APG1000 and VGF24GL) powered by natural gas. Total capacity power plants – 3000 kW. The project provides for heat recovery exhaust gases and the hot circuit of the engine of the generator set with the purpose of its useful use for the needs of the enterprise. System the power plant control allows the operation of generator sets aggregates in parallel with each other. All works and delivery the equipment is completed on time and with proper quality. OMZ OJSC Golitsynsky is ready to continue cooperation with Technoserv on to further increase the capacity of the power plant and other issues."

"EXPOTRADE" Deresh V. V. General Director of Expotrade CJSC

"On behalf of our company, we express our sincere gratitude for the technical re-equipment of the existing steam boiler room with the transfer to the hot water mode with the installation of three hot water boilers with a total capacity of 8.4 MW, in the scope of work: re-negotiation of the fuel regime, development of the design documentation, passing the examination of "Industrial safety", execution of dismantling and installation works, carrying out commissioning and maintenance work, commissioning for industrial operation of the boiler room of the River Side business center. Thanks to high quality of work and professionalism of your company's staff the object was commissioned on time, and all the tasks were completed in full obligations under the contract. It should also be noted that technical potential, highly qualified employees and the promptness of resolving issues by Technoserv.

MINISTRY OF HOUSING AND COMMUNAL SERVICES AND ENERGY REPUBLIC OF SAKHA (YAKUTIA) Levin G. P. Minister of Housing and Communal Services and Energy Republic of Sakha (Yakutia)

We express our gratitude for the contribution to the development of housing and communal services farms of the Republic of Sakha (Yakutia). Thanks to your due to professionalism, hard work and responsible attitude to business, we we continue modernization and technical re-equipment housing and communal services, we are putting new facilities into operation life support, we promote the introduction of modern technologies.

Take part in our events

Events calendar


01 / 01
thu
03:00 (msk)
Robotization and optimization of business processes
01 / 01
thu
03:00 (msk)
Telecommunications
01 / 01
thu
03:00 (msk)
Automation of production
01 / 01
thu
03:00 (msk)
State structures
01 / 01
thu
03:00 (msk)
Finance
01 / 01
thu
03:00 (msk)
IT infrastructure
01 / 01
thu
03:00 (msk)
Transport
01 / 01
thu
03:00 (msk)
Information security
01 / 01
thu
03:00 (msk)
Information infrastructure
01 / 01
thu
03:00 (msk)
Energy
01 / 01
thu
03:00 (msk)
Industry
01 / 01
thu
03:00 (msk)
Retail
01 / 01
thu
03:00 (msk)
Corporate telecommunications
01 / 01
thu
03:00 (msk)
Monitoring systems
01 / 01
thu
03:00 (msk)
Data centers
01 / 01
thu
03:00 (msk)
Tele2 Russia
01 / 01
thu
03:00 (msk)
Court of the Russian Federation
10 / 01
tue
00:00 (msk)
Новый статус «ТехноСерв А/С»
19 / 01
thu
00:00 (msk)
«ТехноСерв А/С» на ХI Международном Форуме «Технологии безопасности»
31 / 01
tue
00:00 (msk)
«ТехноСерв А/С» подтвердил статус Cisco Gold Partner Certified
03 / 03
fri
00:00 (msk)
OSS для операторов сотовой связи
13 / 03
mon
00:00 (msk)
EMC повышает статус «ТехноСерв А/С»
28 / 03
tue
00:00 (msk)
Итоги 2005
06 / 04
thu
00:00 (msk)
Новая специализация от Hewlett-Packard
11 / 05
thu
00:00 (msk)
Ведущий ВУЗ России в области менеджмента открыл курс по приложениям Oracle
01 / 06
thu
00:00 (msk)
Новые награды «ТехноСерв А/С»
13 / 06
tue
00:00 (msk)
«Нефтегаз–2006»
03 / 07
mon
00:00 (msk)
«ТехноСерв А/С» получил очередную награду от EMC Corporation
21 / 08
mon
00:00 (msk)
Экспозиция «ТехноСерв А/С» на Storage Expo Russia 2006
24 / 08
thu
00:00 (msk)
Barracuda Spam Firewall защитит от русского спама
To your business